BoulevardLabs
NAVAL AVIATION From an Access database to a Certificate-to-Field in under 90 days $1.85M → $4.5M INSTALLATION READINESS 200 installations, one screen 200+ SITES · 24/7/365
GHOST WORKS No Soup Sandwich · ODCS Internship 90-DAY CLOCK · PUBLISHED EXPLORE GHOST WORKS →
PAST PERFORMANCE

Where a customer can't be named, the component and scale are characterized instead.

ALL WORK
CAREERS

Engineering, data science, and Ghost Works.

OPEN ROLES INTERNSHIPS

Hands-on projects and practical challenges, including our Drone Development internship.

EXPLORE INTERNSHIPS →
PRODUCTS

Four systems, each built because a client could not buy it.

Unlike most consultancies, we ship our own software. Every product here began as a gap an engagement surfaced: something the customer needed, could not procure, and could not wait another acquisition cycle for.

Each page states where the system runs, its authorization posture, and which vehicle to buy it on. Those three questions decide whether software lands in a federal environment.

EXPLORE THE PRODUCTS REQUEST A DEMO
01 RAM 02 SMARTRAQ 03 OPAL 04 ECHO
RELIABILITY ANALYTICS MODEL IN PRODUCTION

RAM

Availability, MTTR and MTBCF computed continuously across a distributed estate.

200+ ARMY INSTALLATIONS · 24/7/365
RAM · REPRESENTATIVE INTERFACE ILLUSTRATIVE, NOT LIVE DATA
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao)98.81%▲ +0.32% vs. previous period
FMC Sites 187 of 193 total sites
97%
NMC Sites 6 of 193 total sites
3%
Critical Issues 4 require immediate attention
›
Installations MapSite operational status across the enterprise
Fully Mission CapablePartially Mission CapableNot Mission Capable
MISSION AREA Pacific Atlantic
+−
193Total InstallationsEnterpriseAll regions
Site Readiness SummaryView All Sites →
Fully Mission Capable (FMC)18797%
Partially Mission Capable (PMC)32%
Not Mission Capable (NMC)63%
Current System StatusOperationalAll core systems online
›
Forecasted Availability (30-Day)98.4%▲ +0.6%
›
⚠Top 5 Sites Requiring AttentionView All →
#Site NameStatusRiskTrend
1Installation 014NMCHigh↑
2Installation 027PMCHigh↑
3Installation 041PMCMedium→
4Installation 058NMCMedium↑
5Installation 073PMCMedium↑
Availability Trend
Today7 Days30 Days90 Days
100%95%90%85% 98.4% Stable and above target
Readiness by Region
CONUS98%
OCONUS96%
Alaska94%
Hawaii92%
Europe89%
Other96%
12Systems Currently Degraded›
4Critical Outages›
+0.6%Readiness Change from Previous Period›
9Installations at Risk of Becoming NMC›
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao) 98.21%
▲ +0.6%
Mean Time to Repair (MTTR) 4.2 hrs
▼ −18%
Mean Time Between Critical Failures 1,248 hrs
▲ +22%
Predicted Failures (next 30 days) 12
▲ +33%
Vulnerability / Risk Score 28 / 100
▼ −15%
⚠Assets Most Likely to Require AttentionView All →
AssetHealthFailure RiskProbable CauseRecommended Action
CAM-1042Perimeter Camera 28% High Power supply degradation Replace power supply
SRV-2287Core Network Switch 42% High Thermal stress / overheating Schedule replacement
SNS-3160Environmental Sensor 55% Medium Sensor drift (calibration) Recalibrate sensor
PWR-5512Power Distribution Unit 71% Medium Fan degradation Replace cooling fan
NET-6603Edge Router 76% Low Firmware version (EOL) Update firmware
CAM-9921Parking Lot Camera 82% Low None Monitor
Top Failure DriversView Details →
Power Supply31%
Network Controller22%
Sensor Assembly17%
Camera Hardware12%
Other18%
Failure Driver TrendLast 12 Months ⌄
0102030JanMarMayJulSepNov
Reliability BreakdownReliability by asset type
Cameras99.1%
Sensors97.4%
Network Equipment96.2%
Power Systems94.8%
Compute/Servers96.9%
Recommended Preventative Maintenance 18actions recommended
5High Priority
9Medium Priority
4Low Priority
Repair vs. Replace Indicator
72%Recommend
Repair
Repair (72%)Evaluate (18%)Replace (10%)
Time RangeLast 30 Days⌄
Asset TypeAll Types⌄
InstallationAll Sites⌄
Risk LevelAll Levels⌄
↻ Reset Filters
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Total Open Tickets
193
▲ 12%  vs. last 30 days
Mean Time to Repair (MTTR)
4.2days
▼ 18%  vs. last 30 days
Overdue Tickets
36
▼ 12%  vs. last 7 days
Tickets Approaching SLA Limit
21
▲ 40%  vs. last 7 days
Parts Awaiting Replacement
64
▲ 18%  vs. last 30 days
Action QueueMost urgent tickets to be fixed nextView All →
PriorityInstallationSystemIssueAgeAssigned
CRITICALFort ExampleAccess ControlController Offline6 hrsJ. Smith
HIGHSite BravoCCTVCamera Network3 daysM. Jones
HIGHSite DeltaSensorReplacement Part34 daysAwaiting Parts
MEDIUMCamp EchoEntry GateBadge Reader Fault1 dayA. Brown
LOWSite OrionIntercomAudio Distortion5 daysT. Lee
Tickets by PriorityView All →
193Open Tickets
Critical18(9%)
High47(24%)
Medium82(42%)
Low46(24%)
Tickets by Region / SiteView All →
RegionOpen Tickets
CENTCOM48
EUCOM32
INDOPACOM28
NORTHCOM24
SOUTHCOM18
AFRICOM16
Other27
Technician / FSR WorkloadBy Open Tickets ⌄
J. Smith28
M. Jones25
A. Brown19
T. Lee16
R. Davis14
S. Patel12
K. Nguyen11
C. Wilson9
0102030
Parts Availability
78%In Stock
In Stock1,240
Low Stock312
Out of Stock148
On Order276
FiltersReset All
Ticket AgeAll Ages⌄
StatusOpen, Pending, Closed⌄
PriorityAll Priorities⌄
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contract Summary: N00000-00-D-0000
Contract Ceiling $49.5M
Total Obligation $25.0M
Available Ceiling $23.8M
Expiration Date of Contract 06/24/2027
Number of TOs/DOs on Contract 3
Number of Months Remaining 23
Current Option Year Funding $25.8M
Current Option Year Start 06/25/2022
Current Option Year End 06/24/2027
Filter Below Information by Customer ▾
Updated Selected Funding Documents
$50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0.00
Funded Obligated Ceiling Forecasted
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contracts ACRNs Contract Years Aircraft TO/DOs CLINs Invoices FDs PIDs
Funding Documents associated with contract number N00000-00-D-0000
Type*:
Contract▾
Funding Document Number*:
N5702524RC0044
Direct Cite Funds*:
$2,476,111.00
Reimbursable*:
$0.00
Authorized Amount*:
$2,476,111.00
Fund Type*:
17*1804 - O&MN - Navy▾
Appropriation Year:
2022
Option Year*:
0
Begin Date:
10/01/2023
Expiration Date:
09/30/2024
Customer*:
Boulevard Consulting Group▾
Project*:
BOULEVARD▾
Total Funded $9,241,892.00
Funds Used $9,241,888.51
Funds Available $3.49
Funding Document Amendments · funding document ID 1680
ID Amendment Date Direct Cite Amendment Amount
Select Copy 2000 2024-01-03 $1,762,007 $1,762,007
Select Copy 2296 2024-01-03 $3,432,509 $1,762,007
Select Copy 2329 2024-01-03 $1,571,265 $1,762,007
Enter New Amendment
Amendment Date:
mm/dd/yyyy
Direct Cite Funds*:
 
Amendment Amount*:
 
Save
Upload Delete
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Flight Hours Fuel Rates Vendor Fuel vs. Flight Hour
Select Fiscal Year
FY2024 ▾
Flight Time Overview - FY2024 Cumulative Flight Hours Over Time
2000.0 15000.0 10000.0 5000.0 0.0
2022-06-25 Oct ’23 Nov ’23 Dec ’23 2024 Feb ’24 Mar ’24 Apr ’24 May ’24 Jun’24 Jul ’24 Aug ’24
Date
Contract Vendor Customers
Contract Analysis
OPAL
Search
5
New Project
Alternatives
▴
▾
5
Capabilities
▴
▾
18
Requirements
▴
▾
2
Coverage
▴
▾
100
Alternative Scores Requirements Matrix Risk Assessment Coverage Map
Amount Per Month MonthYear
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
2022 2023 2024
Conversion Rate MonthYear
Jan Feb Mar Apr May Jun Jul Aug
Group A Group B Group C
Daily Report MonthYear
August
SUN 3 MON 4 TUE 5 WED 6 THU 7 FRI 8 SAT 9
62%
2022 2023 2024
OPAL
Search
5
Sensitivity Analysis Report
Variation
10.0%
Iteration
50
DronGun Tactical RfOne Mk2 SCORPION® 3 TrakkaBeam TLX-G Anduril's Interceptor
Adjustable Table View N/A N/A N/A N/A N/A
Notifications Based on RoE N/A N/A N/A N/A N/A
Battery Nominal Voltage 2.0 2.0 12.0 87.0 N/A
Beam Width (Focus) Range 12.0 2.0 12.0 87.0 N/A
Effective Range 2.0 2.0 12.0 N/A N/A
Remarkable by User 2.0 2.0 12.0 N/A N/A
Total Lumens 2.0 2.0 12.0 N/A N/A
RF Interdiction Capabilities 2.0 2.0 12.0 N/A N/A
Sensor and Defeat Capability 2.0 2.0 12.0 N/A N/A
Quantity of Contacts 2.0 2.0 12.0 N/A N/A
Identifiable Symbology/Graphics 2.0 2.0 12.0 N/A N/A
Min Rank Max Rank Mean Rank Std Dev
Adjustable Table View 2.0 4.0 3.2 0.8
Notifications Based on RoE 2.0 4.0 3.3 0.7
Battery Nominal Voltage 2.0 2.0 2.5 87.0
Beam Width (Focus) Range 1.0 2.0 12.0 87.0
Boot Up Time 5.0 2.0 12.0 0.0
OPAL
Search
5
Capability Matrix
Capability Score Realized Score Notes
Battery Nominal Voltage 134190273192 0.0 Analysis Based On: Pro…
Total Lumens 124123410875 75.0 Analysis Based On: Pro…
Effective Range 077683141322 50.0 Analysis Based On: Pro…
RF Interference Recovery Capabilities 143847697668 0.0 Analysis Based On: Pro…
Beam Width (Focus) Range 766438907543 0.0 Analysis Based On: Pro…
Boot Up Time 436875697436 50.0 Analysis Based On: Pro…
Display of Sensor and Defeat Capabilities 124123410875 50.0 Analysis Based On: Pro…
Field of View 077683141322 0.0 Analysis Based On: Pro…
Data Contract Display 143847697668 0.0 Analysis Based On: Pro…
Esaily Identifiable Symbology/Graphics 766438907543 50.0 Analysis Based On: Pro…
Total… Effe… RF In… Dete… Bea… Boot… Disp… Fiel… Data… Easi… Cont… Disp… Quan… Audi… Inte… 3D U…
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ECHO
Search
DavidAdministrator 15
Transcriptions
Records▶Interview Series▶Interview-0412.mp4
[00:08:03] David: Today's discussion will be about scheduling a meeting with a client on March 4, 2025.She confirmed availability and coordination details prior to the meeting. ···
[00:08:17] David: Before we begin, can you walk me through the scheduling process? ···
[00:08:29] Katie: Of course. I would be glad to detail how our meeting has been scheduled. ···
Edit text Add tags Change speaker Link to selection Add comment
[ VIDEO FRAME ]
CC480p1.25x⤢
▶ 00:08:16| 00:34:10
Description Recorded interview covering meeting logistics, availability and follow-up coordination. Speakers identified automatically; timestamps linked to the source video for review. …more
Tags
Interview✕Scheduling✕▼
Save Transcript Export
ECHO
Search
DavidAdministrator 15
Transcription RepositoryRepository Overview
Your Storage97% left
500 GB of storage used
File NameModifiedModified BySize•••
Patient Case RecordsJanuary 22, 2020David Thomas45 MB•••
Clinical Trial TestimoniesApril 15, 2021David Thomas5 GB•••
Medical Training SessionsMay 21, 2022David Thomas114 MB•••
University SymposiumAugust 3, 2022Jessica Daniels45 MB•••
Diagnostic InterviewsSeptember 12, 2022James Thomas5 GB•••
Policy Briefings and UpdatesSeptember 17, 2022James Thomas114 MB•••
Scientific BriefingsNovember 1, 2022David Thomas45 MB•••
Peer Review PanelsDecember 15, 2022Jessica Daniels5 GB•••
Research Project DebriefsFebruary 10, 2023David Thomas114 MB•••
Board Review SessionsMarch 2, 2023Jessica Daniels45 MB•••
Quarterly Compliance CallsApril 18, 2023James Thomas5 GB•••
Field Interview ArchiveMay 9, 2023David Thomas114 MB•••
ECHO
Search
DavidAdministrator 15
Welcome David!Glad you’re here. Let’s get you started.
Your Storage97% left
500 GB of storage used
Tutorials & Tips: Uploading a File ✕
Add
Turn your recordings into text by dropping your files here or browsing to upload.
Recent Files
Search
File NameDurationFile TypeSize•••
MP4"The Day I Almost Missed the Train"2:34MP445 MB•••
MOV"How I Found My Lost Dog"2:12MOV5 GB•••
MP4"The Coffee Spill That Changed My Day"2:50MP4114 MB•••
MP4"Heated Exchange on the Metro"3:02MP445 MB•••
MP4"When My Basement Flooded"2:31MP45 GB•••
MOV"The Night the Power Went Out"3:15MOV114 MB•••
MP4"A Surprise at the Airport"2:48MP445 MB•••
MP4"Lost Keys on a Rainy Morning"1:57MP45 GB•••
{{ pdViewLabel }} OF 03 · {{ pdProductName }}
← →

RAM began as a question an Army installation-management office could not answer: how available is the estate this morning? Every individual site could answer for itself. The enterprise could not answer for the whole, because the four systems that held the underlying records disagreed, not through error, but because each was authoritative for something slightly different and all four had been given the same vocabulary.

What it computes

RAM produces three figures continuously rather than on a reporting cycle: availability, mean time to repair, and mean time between critical failures. Each is defined once, in writing, with a named authoritative source and a published refresh cadence. When a number is stale rather than wrong, the interface says so, which is the distinction most readiness reporting collapses.

Faults do not arrive as a list. Each surfaces alongside a probable cause and a recommended mitigation scoped to the asset type, because an alert that tells a maintenance officer something is down without telling them what it usually means is an interruption, not information.

How it stays honest

The forecasting layer retrains against completed work orders rather than a fixed baseline. Organizations generate the evidence that their own estimates are drifting (actual repair durations, realized parts waits) and almost never wire it back in. RAM closes that loop as a standing process, which is why its accuracy holds through a deployment cycle instead of degrading quietly until somebody stops trusting the screen.

Where it runs

RAM operates inside the customer's accreditation boundary. Authorization posture was a design input from the first sprint: where it runs, which control set applies, and who signs. It is available to federal customers through GSA MAS and SeaPort NxG.

CAPABILITIES
Availability & MTTR MTBCF Trending Fault Probable Cause Predictive Maintenance Multi-Site Rollup Data Reconciliation
TALK ABOUT RAM

Tell us the decision this would have to support and we will show you the version of it that fits your environment.

DISCUSS RAM →
HOW TO BUY GSA MAS · SeaPort NxG · COMFRC IDIQ CONTRACTING DETAIL →
POST-AWARD FINANCIAL OVERSIGHT FIELDED

SmarTraq

Obligations, burn rate and an audit-ready trail, with anomaly forecasting.

COMPTROLLER SHOPS AND PROGRAM FINANCIAL MANAGERS
SMARTRAQ · REPRESENTATIVE INTERFACE ILLUSTRATIVE, NOT LIVE DATA
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao)98.81%▲ +0.32% vs. previous period
FMC Sites 187 of 193 total sites
97%
NMC Sites 6 of 193 total sites
3%
Critical Issues 4 require immediate attention
›
Installations MapSite operational status across the enterprise
Fully Mission CapablePartially Mission CapableNot Mission Capable
MISSION AREA Pacific Atlantic
+−
193Total InstallationsEnterpriseAll regions
Site Readiness SummaryView All Sites →
Fully Mission Capable (FMC)18797%
Partially Mission Capable (PMC)32%
Not Mission Capable (NMC)63%
Current System StatusOperationalAll core systems online
›
Forecasted Availability (30-Day)98.4%▲ +0.6%
›
⚠Top 5 Sites Requiring AttentionView All →
#Site NameStatusRiskTrend
1Installation 014NMCHigh↑
2Installation 027PMCHigh↑
3Installation 041PMCMedium→
4Installation 058NMCMedium↑
5Installation 073PMCMedium↑
Availability Trend
Today7 Days30 Days90 Days
100%95%90%85% 98.4% Stable and above target
Readiness by Region
CONUS98%
OCONUS96%
Alaska94%
Hawaii92%
Europe89%
Other96%
12Systems Currently Degraded›
4Critical Outages›
+0.6%Readiness Change from Previous Period›
9Installations at Risk of Becoming NMC›
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao) 98.21%
▲ +0.6%
Mean Time to Repair (MTTR) 4.2 hrs
▼ −18%
Mean Time Between Critical Failures 1,248 hrs
▲ +22%
Predicted Failures (next 30 days) 12
▲ +33%
Vulnerability / Risk Score 28 / 100
▼ −15%
⚠Assets Most Likely to Require AttentionView All →
AssetHealthFailure RiskProbable CauseRecommended Action
CAM-1042Perimeter Camera 28% High Power supply degradation Replace power supply
SRV-2287Core Network Switch 42% High Thermal stress / overheating Schedule replacement
SNS-3160Environmental Sensor 55% Medium Sensor drift (calibration) Recalibrate sensor
PWR-5512Power Distribution Unit 71% Medium Fan degradation Replace cooling fan
NET-6603Edge Router 76% Low Firmware version (EOL) Update firmware
CAM-9921Parking Lot Camera 82% Low None Monitor
Top Failure DriversView Details →
Power Supply31%
Network Controller22%
Sensor Assembly17%
Camera Hardware12%
Other18%
Failure Driver TrendLast 12 Months ⌄
0102030JanMarMayJulSepNov
Reliability BreakdownReliability by asset type
Cameras99.1%
Sensors97.4%
Network Equipment96.2%
Power Systems94.8%
Compute/Servers96.9%
Recommended Preventative Maintenance 18actions recommended
5High Priority
9Medium Priority
4Low Priority
Repair vs. Replace Indicator
72%Recommend
Repair
Repair (72%)Evaluate (18%)Replace (10%)
Time RangeLast 30 Days⌄
Asset TypeAll Types⌄
InstallationAll Sites⌄
Risk LevelAll Levels⌄
↻ Reset Filters
RAM · Reliability trend
● 200+ SITES · 24/7/365
MTBCF
412 hrs ▲ 18
SITES REPORTING
206
DATA LATENCY
14 min
MTBCF · ROLLING 12 MONTHS RECONCILED ACROSS 4 SOURCE SYSTEMS
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contract Summary: N00000-00-D-0000
Contract Ceiling $49.5M
Total Obligation $25.0M
Available Ceiling $23.8M
Expiration Date of Contract 06/24/2027
Number of TOs/DOs on Contract 3
Number of Months Remaining 23
Current Option Year Funding $25.8M
Current Option Year Start 06/25/2022
Current Option Year End 06/24/2027
Filter Below Information by Customer ▾
Updated Selected Funding Documents
$50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0.00
Funded Obligated Ceiling Forecasted
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contracts ACRNs Contract Years Aircraft TO/DOs CLINs Invoices FDs PIDs
Funding Documents associated with contract number N00000-00-D-0000
Type*:
Contract▾
Funding Document Number*:
N5702524RC0044
Direct Cite Funds*:
$2,476,111.00
Reimbursable*:
$0.00
Authorized Amount*:
$2,476,111.00
Fund Type*:
17*1804 - O&MN - Navy▾
Appropriation Year:
2022
Option Year*:
0
Begin Date:
10/01/2023
Expiration Date:
09/30/2024
Customer*:
Boulevard Consulting Group▾
Project*:
BOULEVARD▾
Total Funded $9,241,892.00
Funds Used $9,241,888.51
Funds Available $3.49
Funding Document Amendments · funding document ID 1680
ID Amendment Date Direct Cite Amendment Amount
Select Copy 2000 2024-01-03 $1,762,007 $1,762,007
Select Copy 2296 2024-01-03 $3,432,509 $1,762,007
Select Copy 2329 2024-01-03 $1,571,265 $1,762,007
Enter New Amendment
Amendment Date:
mm/dd/yyyy
Direct Cite Funds*:
 
Amendment Amount*:
 
Save
Upload Delete
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Flight Hours Fuel Rates Vendor Fuel vs. Flight Hour
Select Fiscal Year
FY2024 ▾
Flight Time Overview - FY2024 Cumulative Flight Hours Over Time
2000.0 15000.0 10000.0 5000.0 0.0
2022-06-25 Oct ’23 Nov ’23 Dec ’23 2024 Feb ’24 Mar ’24 Apr ’24 May ’24 Jun’24 Jul ’24 Aug ’24
Date
Contract Vendor Customers
Contract Analysis
OPAL
Search
5
New Project
Alternatives
▴
▾
5
Capabilities
▴
▾
18
Requirements
▴
▾
2
Coverage
▴
▾
100
Alternative Scores Requirements Matrix Risk Assessment Coverage Map
Amount Per Month MonthYear
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
2022 2023 2024
Conversion Rate MonthYear
Jan Feb Mar Apr May Jun Jul Aug
Group A Group B Group C
Daily Report MonthYear
August
SUN 3 MON 4 TUE 5 WED 6 THU 7 FRI 8 SAT 9
62%
2022 2023 2024
OPAL
Search
5
Sensitivity Analysis Report
Variation
10.0%
Iteration
50
DronGun Tactical RfOne Mk2 SCORPION® 3 TrakkaBeam TLX-G Anduril's Interceptor
Adjustable Table View N/A N/A N/A N/A N/A
Notifications Based on RoE N/A N/A N/A N/A N/A
Battery Nominal Voltage 2.0 2.0 12.0 87.0 N/A
Beam Width (Focus) Range 12.0 2.0 12.0 87.0 N/A
Effective Range 2.0 2.0 12.0 N/A N/A
Remarkable by User 2.0 2.0 12.0 N/A N/A
Total Lumens 2.0 2.0 12.0 N/A N/A
RF Interdiction Capabilities 2.0 2.0 12.0 N/A N/A
Sensor and Defeat Capability 2.0 2.0 12.0 N/A N/A
Quantity of Contacts 2.0 2.0 12.0 N/A N/A
Identifiable Symbology/Graphics 2.0 2.0 12.0 N/A N/A
Min Rank Max Rank Mean Rank Std Dev
Adjustable Table View 2.0 4.0 3.2 0.8
Notifications Based on RoE 2.0 4.0 3.3 0.7
Battery Nominal Voltage 2.0 2.0 2.5 87.0
Beam Width (Focus) Range 1.0 2.0 12.0 87.0
Boot Up Time 5.0 2.0 12.0 0.0
OPAL
Search
5
Capability Matrix
Capability Score Realized Score Notes
Battery Nominal Voltage 134190273192 0.0 Analysis Based On: Pro…
Total Lumens 124123410875 75.0 Analysis Based On: Pro…
Effective Range 077683141322 50.0 Analysis Based On: Pro…
RF Interference Recovery Capabilities 143847697668 0.0 Analysis Based On: Pro…
Beam Width (Focus) Range 766438907543 0.0 Analysis Based On: Pro…
Boot Up Time 436875697436 50.0 Analysis Based On: Pro…
Display of Sensor and Defeat Capabilities 124123410875 50.0 Analysis Based On: Pro…
Field of View 077683141322 0.0 Analysis Based On: Pro…
Data Contract Display 143847697668 0.0 Analysis Based On: Pro…
Esaily Identifiable Symbology/Graphics 766438907543 50.0 Analysis Based On: Pro…
Total… Effe… RF In… Dete… Bea… Boot… Disp… Fiel… Data… Easi… Cont… Disp… Quan… Audi… Inte… 3D U…
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ECHO
Search
DavidAdministrator 15
Transcriptions
Records▶Interview Series▶Interview-0412.mp4
[00:08:03] David: Today's discussion will be about scheduling a meeting with a client on March 4, 2025.She confirmed availability and coordination details prior to the meeting. ···
[00:08:17] David: Before we begin, can you walk me through the scheduling process? ···
[00:08:29] Katie: Of course. I would be glad to detail how our meeting has been scheduled. ···
Edit text Add tags Change speaker Link to selection Add comment
[ VIDEO FRAME ]
CC480p1.25x⤢
▶ 00:08:16| 00:34:10
Description Recorded interview covering meeting logistics, availability and follow-up coordination. Speakers identified automatically; timestamps linked to the source video for review. …more
Tags
Interview✕Scheduling✕▼
Save Transcript Export
ECHO
Search
DavidAdministrator 15
Transcription RepositoryRepository Overview
Your Storage97% left
500 GB of storage used
File NameModifiedModified BySize•••
Patient Case RecordsJanuary 22, 2020David Thomas45 MB•••
Clinical Trial TestimoniesApril 15, 2021David Thomas5 GB•••
Medical Training SessionsMay 21, 2022David Thomas114 MB•••
University SymposiumAugust 3, 2022Jessica Daniels45 MB•••
Diagnostic InterviewsSeptember 12, 2022James Thomas5 GB•••
Policy Briefings and UpdatesSeptember 17, 2022James Thomas114 MB•••
Scientific BriefingsNovember 1, 2022David Thomas45 MB•••
Peer Review PanelsDecember 15, 2022Jessica Daniels5 GB•••
Research Project DebriefsFebruary 10, 2023David Thomas114 MB•••
Board Review SessionsMarch 2, 2023Jessica Daniels45 MB•••
Quarterly Compliance CallsApril 18, 2023James Thomas5 GB•••
Field Interview ArchiveMay 9, 2023David Thomas114 MB•••
ECHO
Search
DavidAdministrator 15
Welcome David!Glad you’re here. Let’s get you started.
Your Storage97% left
500 GB of storage used
Tutorials & Tips: Uploading a File ✕
Add
Turn your recordings into text by dropping your files here or browsing to upload.
Recent Files
Search
File NameDurationFile TypeSize•••
MP4"The Day I Almost Missed the Train"2:34MP445 MB•••
MOV"How I Found My Lost Dog"2:12MOV5 GB•••
MP4"The Coffee Spill That Changed My Day"2:50MP4114 MB•••
MP4"Heated Exchange on the Metro"3:02MP445 MB•••
MP4"When My Basement Flooded"2:31MP45 GB•••
MOV"The Night the Power Went Out"3:15MOV114 MB•••
MP4"A Surprise at the Airport"2:48MP445 MB•••
MP4"Lost Keys on a Rainy Morning"1:57MP45 GB•••
{{ pdViewLabel }} OF 03 · {{ pdProductName }}
← →

SmarTraq exists because most federal financial reporting is retrospective by construction. Commitments, obligations and expenditures are reconciled on a cycle, published, and then interpreted by people who need to know what happens next. The interpretation is where the risk lives: a burn rate presented without its assumptions invites everyone in the room to supply their own, and the resulting disagreement surfaces at exactly the wrong moment.

Continuous reconciliation

Rather than assembling a picture at period close, SmarTraq reconciles commitments, obligations and expenditures against each other on a standing basis. The question of what has actually been spent has one answer at any moment, and that answer is reproducible on request down to the transaction that produced it.

Anomaly forecasting

Outliers are flagged while there is still time to act on them. An anomaly surfaced in week three is a management decision; the same anomaly in a quarterly report is an explanation. Every flag links to the transactions behind it, so the first question in the room is what to do rather than whether the number is real.

Audit-ready by construction

The control evidence is produced as a by-product of running the system rather than reconstructed before an assessment. An audit becomes a report instead of a project. This is built for people who have to answer for a figure in front of someone, not merely publish it.

Origin

The capability was first built for a NAVAIR program office running contracted air services funding in Microsoft Access. It was rebuilt as accreditable software and delivered inside 90 days; the Navy returned with a five-year sole-source follow-on.

CAPABILITIES
Obligation Tracking Burn Rate & Forecast Anomaly Detection Audit Trail Funding Documents Contract Performance
TALK ABOUT SMARTRAQ

Tell us the decision this would have to support and we will show you the version of it that fits your environment.

DISCUSS SMARTRAQ →
HOW TO BUY GSA MAS · SeaPort NxG · COMFRC IDIQ CONTRACTING DETAIL →
PRE-AWARD ACQUISITION INTELLIGENCE FIELDED

OPAL

Requirements, market research and solicitation development, with the context intact.

1102S AND ACQUISITION STRATEGY TEAMS
OPAL · REPRESENTATIVE INTERFACE ILLUSTRATIVE, NOT LIVE DATA
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao)98.81%▲ +0.32% vs. previous period
FMC Sites 187 of 193 total sites
97%
NMC Sites 6 of 193 total sites
3%
Critical Issues 4 require immediate attention
›
Installations MapSite operational status across the enterprise
Fully Mission CapablePartially Mission CapableNot Mission Capable
MISSION AREA Pacific Atlantic
+−
193Total InstallationsEnterpriseAll regions
Site Readiness SummaryView All Sites →
Fully Mission Capable (FMC)18797%
Partially Mission Capable (PMC)32%
Not Mission Capable (NMC)63%
Current System StatusOperationalAll core systems online
›
Forecasted Availability (30-Day)98.4%▲ +0.6%
›
⚠Top 5 Sites Requiring AttentionView All →
#Site NameStatusRiskTrend
1Installation 014NMCHigh↑
2Installation 027PMCHigh↑
3Installation 041PMCMedium→
4Installation 058NMCMedium↑
5Installation 073PMCMedium↑
Availability Trend
Today7 Days30 Days90 Days
100%95%90%85% 98.4% Stable and above target
Readiness by Region
CONUS98%
OCONUS96%
Alaska94%
Hawaii92%
Europe89%
Other96%
12Systems Currently Degraded›
4Critical Outages›
+0.6%Readiness Change from Previous Period›
9Installations at Risk of Becoming NMC›
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao) 98.21%
▲ +0.6%
Mean Time to Repair (MTTR) 4.2 hrs
▼ −18%
Mean Time Between Critical Failures 1,248 hrs
▲ +22%
Predicted Failures (next 30 days) 12
▲ +33%
Vulnerability / Risk Score 28 / 100
▼ −15%
⚠Assets Most Likely to Require AttentionView All →
AssetHealthFailure RiskProbable CauseRecommended Action
CAM-1042Perimeter Camera 28% High Power supply degradation Replace power supply
SRV-2287Core Network Switch 42% High Thermal stress / overheating Schedule replacement
SNS-3160Environmental Sensor 55% Medium Sensor drift (calibration) Recalibrate sensor
PWR-5512Power Distribution Unit 71% Medium Fan degradation Replace cooling fan
NET-6603Edge Router 76% Low Firmware version (EOL) Update firmware
CAM-9921Parking Lot Camera 82% Low None Monitor
Top Failure DriversView Details →
Power Supply31%
Network Controller22%
Sensor Assembly17%
Camera Hardware12%
Other18%
Failure Driver TrendLast 12 Months ⌄
0102030JanMarMayJulSepNov
Reliability BreakdownReliability by asset type
Cameras99.1%
Sensors97.4%
Network Equipment96.2%
Power Systems94.8%
Compute/Servers96.9%
Recommended Preventative Maintenance 18actions recommended
5High Priority
9Medium Priority
4Low Priority
Repair vs. Replace Indicator
72%Recommend
Repair
Repair (72%)Evaluate (18%)Replace (10%)
Time RangeLast 30 Days⌄
Asset TypeAll Types⌄
InstallationAll Sites⌄
Risk LevelAll Levels⌄
↻ Reset Filters
RAM · Reliability trend
● 200+ SITES · 24/7/365
MTBCF
412 hrs ▲ 18
SITES REPORTING
206
DATA LATENCY
14 min
MTBCF · ROLLING 12 MONTHS RECONCILED ACROSS 4 SOURCE SYSTEMS
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contract Summary: N00000-00-D-0000
Contract Ceiling $49.5M
Total Obligation $25.0M
Available Ceiling $23.8M
Expiration Date of Contract 06/24/2027
Number of TOs/DOs on Contract 3
Number of Months Remaining 23
Current Option Year Funding $25.8M
Current Option Year Start 06/25/2022
Current Option Year End 06/24/2027
Filter Below Information by Customer ▾
Updated Selected Funding Documents
$50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0.00
Funded Obligated Ceiling Forecasted
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contracts ACRNs Contract Years Aircraft TO/DOs CLINs Invoices FDs PIDs
Funding Documents associated with contract number N00000-00-D-0000
Type*:
Contract▾
Funding Document Number*:
N5702524RC0044
Direct Cite Funds*:
$2,476,111.00
Reimbursable*:
$0.00
Authorized Amount*:
$2,476,111.00
Fund Type*:
17*1804 - O&MN - Navy▾
Appropriation Year:
2022
Option Year*:
0
Begin Date:
10/01/2023
Expiration Date:
09/30/2024
Customer*:
Boulevard Consulting Group▾
Project*:
BOULEVARD▾
Total Funded $9,241,892.00
Funds Used $9,241,888.51
Funds Available $3.49
Funding Document Amendments · funding document ID 1680
ID Amendment Date Direct Cite Amendment Amount
Select Copy 2000 2024-01-03 $1,762,007 $1,762,007
Select Copy 2296 2024-01-03 $3,432,509 $1,762,007
Select Copy 2329 2024-01-03 $1,571,265 $1,762,007
Enter New Amendment
Amendment Date:
mm/dd/yyyy
Direct Cite Funds*:
 
Amendment Amount*:
 
Save
Upload Delete
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Flight Hours Fuel Rates Vendor Fuel vs. Flight Hour
Select Fiscal Year
FY2024 ▾
Flight Time Overview - FY2024 Cumulative Flight Hours Over Time
2000.0 15000.0 10000.0 5000.0 0.0
2022-06-25 Oct ’23 Nov ’23 Dec ’23 2024 Feb ’24 Mar ’24 Apr ’24 May ’24 Jun’24 Jul ’24 Aug ’24
Date
Contract Vendor Customers
Contract Analysis
OPAL
Search
5
New Project
Alternatives
▴
▾
5
Capabilities
▴
▾
18
Requirements
▴
▾
2
Coverage
▴
▾
100
Alternative Scores Requirements Matrix Risk Assessment Coverage Map
Amount Per Month MonthYear
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
2022 2023 2024
Conversion Rate MonthYear
Jan Feb Mar Apr May Jun Jul Aug
Group A Group B Group C
Daily Report MonthYear
August
SUN 3 MON 4 TUE 5 WED 6 THU 7 FRI 8 SAT 9
62%
2022 2023 2024
OPAL
Search
5
Sensitivity Analysis Report
Variation
10.0%
Iteration
50
DronGun Tactical RfOne Mk2 SCORPION® 3 TrakkaBeam TLX-G Anduril's Interceptor
Adjustable Table View N/A N/A N/A N/A N/A
Notifications Based on RoE N/A N/A N/A N/A N/A
Battery Nominal Voltage 2.0 2.0 12.0 87.0 N/A
Beam Width (Focus) Range 12.0 2.0 12.0 87.0 N/A
Effective Range 2.0 2.0 12.0 N/A N/A
Remarkable by User 2.0 2.0 12.0 N/A N/A
Total Lumens 2.0 2.0 12.0 N/A N/A
RF Interdiction Capabilities 2.0 2.0 12.0 N/A N/A
Sensor and Defeat Capability 2.0 2.0 12.0 N/A N/A
Quantity of Contacts 2.0 2.0 12.0 N/A N/A
Identifiable Symbology/Graphics 2.0 2.0 12.0 N/A N/A
Min Rank Max Rank Mean Rank Std Dev
Adjustable Table View 2.0 4.0 3.2 0.8
Notifications Based on RoE 2.0 4.0 3.3 0.7
Battery Nominal Voltage 2.0 2.0 2.5 87.0
Beam Width (Focus) Range 1.0 2.0 12.0 87.0
Boot Up Time 5.0 2.0 12.0 0.0
OPAL
Search
5
Capability Matrix
Capability Score Realized Score Notes
Battery Nominal Voltage 134190273192 0.0 Analysis Based On: Pro…
Total Lumens 124123410875 75.0 Analysis Based On: Pro…
Effective Range 077683141322 50.0 Analysis Based On: Pro…
RF Interference Recovery Capabilities 143847697668 0.0 Analysis Based On: Pro…
Beam Width (Focus) Range 766438907543 0.0 Analysis Based On: Pro…
Boot Up Time 436875697436 50.0 Analysis Based On: Pro…
Display of Sensor and Defeat Capabilities 124123410875 50.0 Analysis Based On: Pro…
Field of View 077683141322 0.0 Analysis Based On: Pro…
Data Contract Display 143847697668 0.0 Analysis Based On: Pro…
Esaily Identifiable Symbology/Graphics 766438907543 50.0 Analysis Based On: Pro…
Total… Effe… RF In… Dete… Bea… Boot… Disp… Fiel… Data… Easi… Cont… Disp… Quan… Audi… Inte… 3D U…
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ECHO
Search
DavidAdministrator 15
Transcriptions
Records▶Interview Series▶Interview-0412.mp4
[00:08:03] David: Today's discussion will be about scheduling a meeting with a client on March 4, 2025.She confirmed availability and coordination details prior to the meeting. ···
[00:08:17] David: Before we begin, can you walk me through the scheduling process? ···
[00:08:29] Katie: Of course. I would be glad to detail how our meeting has been scheduled. ···
Edit text Add tags Change speaker Link to selection Add comment
[ VIDEO FRAME ]
CC480p1.25x⤢
▶ 00:08:16| 00:34:10
Description Recorded interview covering meeting logistics, availability and follow-up coordination. Speakers identified automatically; timestamps linked to the source video for review. …more
Tags
Interview✕Scheduling✕▼
Save Transcript Export
ECHO
Search
DavidAdministrator 15
Transcription RepositoryRepository Overview
Your Storage97% left
500 GB of storage used
File NameModifiedModified BySize•••
Patient Case RecordsJanuary 22, 2020David Thomas45 MB•••
Clinical Trial TestimoniesApril 15, 2021David Thomas5 GB•••
Medical Training SessionsMay 21, 2022David Thomas114 MB•••
University SymposiumAugust 3, 2022Jessica Daniels45 MB•••
Diagnostic InterviewsSeptember 12, 2022James Thomas5 GB•••
Policy Briefings and UpdatesSeptember 17, 2022James Thomas114 MB•••
Scientific BriefingsNovember 1, 2022David Thomas45 MB•••
Peer Review PanelsDecember 15, 2022Jessica Daniels5 GB•••
Research Project DebriefsFebruary 10, 2023David Thomas114 MB•••
Board Review SessionsMarch 2, 2023Jessica Daniels45 MB•••
Quarterly Compliance CallsApril 18, 2023James Thomas5 GB•••
Field Interview ArchiveMay 9, 2023David Thomas114 MB•••
ECHO
Search
DavidAdministrator 15
Welcome David!Glad you’re here. Let’s get you started.
Your Storage97% left
500 GB of storage used
Tutorials & Tips: Uploading a File ✕
Add
Turn your recordings into text by dropping your files here or browsing to upload.
Recent Files
Search
File NameDurationFile TypeSize•••
MP4"The Day I Almost Missed the Train"2:34MP445 MB•••
MOV"How I Found My Lost Dog"2:12MOV5 GB•••
MP4"The Coffee Spill That Changed My Day"2:50MP4114 MB•••
MP4"Heated Exchange on the Metro"3:02MP445 MB•••
MP4"When My Basement Flooded"2:31MP45 GB•••
MOV"The Night the Power Went Out"3:15MOV114 MB•••
MP4"A Surprise at the Airport"2:48MP445 MB•••
MP4"Lost Keys on a Rainy Morning"1:57MP45 GB•••
{{ pdViewLabel }} OF 03 · {{ pdProductName }}
← →

OPAL addresses the part of acquisition that happens before anyone can be held to a schedule. Requirements arrive from several directions, market research is assembled under deadline from whatever sources are reachable, and the resulting package carries none of the reasoning that produced it, so the first hard question from a reviewer sends the team back to work already done.

Market research that cites

OPAL builds market research from the sources a contracting officer would actually cite, and records the qualification logic alongside each entry: why a vendor was included, why another was not, and which assumption would change that. The output is defensible rather than merely thorough.

Traceable requirements

Every requirement traces to the operational need that justifies it. Requirements that cannot be traced stay visible as a count rather than quietly passing into the solicitation. That is the single cheapest protest defense available to a program.

Readiness by section

Solicitation readiness is tracked section by section instead of as one percentage, because the last ten percent of a package is never evenly distributed. A team can see which sections are genuinely finished and which are waiting on a decision nobody has made yet.

What it produces

A buyable package: requirements, market research, and the acquisition strategy narrative, each carrying its own provenance. Options are costed on the same basis so the comparison means something to a reviewer who was not in the room.

CAPABILITIES
Market Research Requirements Traceability Solicitation Development Vendor Qualification Acquisition Strategy Cost Comparability
TALK ABOUT OPAL

Tell us the decision this would have to support and we will show you the version of it that fits your environment.

DISCUSS OPAL →
HOW TO BUY GSA MAS · SeaPort NxG · COMFRC IDIQ CONTRACTING DETAIL →
TRANSCRIPTION FOR RECORDS AND OVERSIGHT FIELDED

ECHO

FOIA response, hearing records, IG interviews and multilingual material.

RECORDS, OVERSIGHT AND ANALYTIC ORGANIZATIONS
ECHO · REPRESENTATIVE INTERFACE ILLUSTRATIVE, NOT LIVE DATA
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao)98.81%▲ +0.32% vs. previous period
FMC Sites 187 of 193 total sites
97%
NMC Sites 6 of 193 total sites
3%
Critical Issues 4 require immediate attention
›
Installations MapSite operational status across the enterprise
Fully Mission CapablePartially Mission CapableNot Mission Capable
MISSION AREA Pacific Atlantic
+−
193Total InstallationsEnterpriseAll regions
Site Readiness SummaryView All Sites →
Fully Mission Capable (FMC)18797%
Partially Mission Capable (PMC)32%
Not Mission Capable (NMC)63%
Current System StatusOperationalAll core systems online
›
Forecasted Availability (30-Day)98.4%▲ +0.6%
›
⚠Top 5 Sites Requiring AttentionView All →
#Site NameStatusRiskTrend
1Installation 014NMCHigh↑
2Installation 027PMCHigh↑
3Installation 041PMCMedium→
4Installation 058NMCMedium↑
5Installation 073PMCMedium↑
Availability Trend
Today7 Days30 Days90 Days
100%95%90%85% 98.4% Stable and above target
Readiness by Region
CONUS98%
OCONUS96%
Alaska94%
Hawaii92%
Europe89%
Other96%
12Systems Currently Degraded›
4Critical Outages›
+0.6%Readiness Change from Previous Period›
9Installations at Risk of Becoming NMC›
RAM
2
Search sites, regions, systems...
RegionAll Regions⌄
Last Updated14:32 UTC Live Data
Operational Availability (Ao) 98.21%
▲ +0.6%
Mean Time to Repair (MTTR) 4.2 hrs
▼ −18%
Mean Time Between Critical Failures 1,248 hrs
▲ +22%
Predicted Failures (next 30 days) 12
▲ +33%
Vulnerability / Risk Score 28 / 100
▼ −15%
⚠Assets Most Likely to Require AttentionView All →
AssetHealthFailure RiskProbable CauseRecommended Action
CAM-1042Perimeter Camera 28% High Power supply degradation Replace power supply
SRV-2287Core Network Switch 42% High Thermal stress / overheating Schedule replacement
SNS-3160Environmental Sensor 55% Medium Sensor drift (calibration) Recalibrate sensor
PWR-5512Power Distribution Unit 71% Medium Fan degradation Replace cooling fan
NET-6603Edge Router 76% Low Firmware version (EOL) Update firmware
CAM-9921Parking Lot Camera 82% Low None Monitor
Top Failure DriversView Details →
Power Supply31%
Network Controller22%
Sensor Assembly17%
Camera Hardware12%
Other18%
Failure Driver TrendLast 12 Months ⌄
0102030JanMarMayJulSepNov
Reliability BreakdownReliability by asset type
Cameras99.1%
Sensors97.4%
Network Equipment96.2%
Power Systems94.8%
Compute/Servers96.9%
Recommended Preventative Maintenance 18actions recommended
5High Priority
9Medium Priority
4Low Priority
Repair vs. Replace Indicator
72%Recommend
Repair
Repair (72%)Evaluate (18%)Replace (10%)
Time RangeLast 30 Days⌄
Asset TypeAll Types⌄
InstallationAll Sites⌄
Risk LevelAll Levels⌄
↻ Reset Filters
RAM · Reliability trend
● 200+ SITES · 24/7/365
MTBCF
412 hrs ▲ 18
SITES REPORTING
206
DATA LATENCY
14 min
MTBCF · ROLLING 12 MONTHS RECONCILED ACROSS 4 SOURCE SYSTEMS
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contract Summary: N00000-00-D-0000
Contract Ceiling $49.5M
Total Obligation $25.0M
Available Ceiling $23.8M
Expiration Date of Contract 06/24/2027
Number of TOs/DOs on Contract 3
Number of Months Remaining 23
Current Option Year Funding $25.8M
Current Option Year Start 06/25/2022
Current Option Year End 06/24/2027
Filter Below Information by Customer ▾
Updated Selected Funding Documents
$50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0.00
Funded Obligated Ceiling Forecasted
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Search Contracts by Contract Number, Contractor Name, or Purpose
Contracts ACRNs Contract Years Aircraft TO/DOs CLINs Invoices FDs PIDs
Funding Documents associated with contract number N00000-00-D-0000
Type*:
Contract▾
Funding Document Number*:
N5702524RC0044
Direct Cite Funds*:
$2,476,111.00
Reimbursable*:
$0.00
Authorized Amount*:
$2,476,111.00
Fund Type*:
17*1804 - O&MN - Navy▾
Appropriation Year:
2022
Option Year*:
0
Begin Date:
10/01/2023
Expiration Date:
09/30/2024
Customer*:
Boulevard Consulting Group▾
Project*:
BOULEVARD▾
Total Funded $9,241,892.00
Funds Used $9,241,888.51
Funds Available $3.49
Funding Document Amendments · funding document ID 1680
ID Amendment Date Direct Cite Amendment Amount
Select Copy 2000 2024-01-03 $1,762,007 $1,762,007
Select Copy 2296 2024-01-03 $3,432,509 $1,762,007
Select Copy 2329 2024-01-03 $1,571,265 $1,762,007
Enter New Amendment
Amendment Date:
mm/dd/yyyy
Direct Cite Funds*:
 
Amendment Amount*:
 
Save
Upload Delete
SmarTraq
DJ
David Johnson
Data Entry ▾
Reports ▾
Analytics ▾
Utilities ▾
Settings ▾
Version 01.05.03.1
Flight Hours Fuel Rates Vendor Fuel vs. Flight Hour
Select Fiscal Year
FY2024 ▾
Flight Time Overview - FY2024 Cumulative Flight Hours Over Time
2000.0 15000.0 10000.0 5000.0 0.0
2022-06-25 Oct ’23 Nov ’23 Dec ’23 2024 Feb ’24 Mar ’24 Apr ’24 May ’24 Jun’24 Jul ’24 Aug ’24
Date
Contract Vendor Customers
Contract Analysis
OPAL
Search
5
New Project
Alternatives
▴
▾
5
Capabilities
▴
▾
18
Requirements
▴
▾
2
Coverage
▴
▾
100
Alternative Scores Requirements Matrix Risk Assessment Coverage Map
Amount Per Month MonthYear
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
2022 2023 2024
Conversion Rate MonthYear
Jan Feb Mar Apr May Jun Jul Aug
Group A Group B Group C
Daily Report MonthYear
August
SUN 3 MON 4 TUE 5 WED 6 THU 7 FRI 8 SAT 9
62%
2022 2023 2024
OPAL
Search
5
Sensitivity Analysis Report
Variation
10.0%
Iteration
50
DronGun Tactical RfOne Mk2 SCORPION® 3 TrakkaBeam TLX-G Anduril's Interceptor
Adjustable Table View N/A N/A N/A N/A N/A
Notifications Based on RoE N/A N/A N/A N/A N/A
Battery Nominal Voltage 2.0 2.0 12.0 87.0 N/A
Beam Width (Focus) Range 12.0 2.0 12.0 87.0 N/A
Effective Range 2.0 2.0 12.0 N/A N/A
Remarkable by User 2.0 2.0 12.0 N/A N/A
Total Lumens 2.0 2.0 12.0 N/A N/A
RF Interdiction Capabilities 2.0 2.0 12.0 N/A N/A
Sensor and Defeat Capability 2.0 2.0 12.0 N/A N/A
Quantity of Contacts 2.0 2.0 12.0 N/A N/A
Identifiable Symbology/Graphics 2.0 2.0 12.0 N/A N/A
Min Rank Max Rank Mean Rank Std Dev
Adjustable Table View 2.0 4.0 3.2 0.8
Notifications Based on RoE 2.0 4.0 3.3 0.7
Battery Nominal Voltage 2.0 2.0 2.5 87.0
Beam Width (Focus) Range 1.0 2.0 12.0 87.0
Boot Up Time 5.0 2.0 12.0 0.0
OPAL
Search
5
Capability Matrix
Capability Score Realized Score Notes
Battery Nominal Voltage 134190273192 0.0 Analysis Based On: Pro…
Total Lumens 124123410875 75.0 Analysis Based On: Pro…
Effective Range 077683141322 50.0 Analysis Based On: Pro…
RF Interference Recovery Capabilities 143847697668 0.0 Analysis Based On: Pro…
Beam Width (Focus) Range 766438907543 0.0 Analysis Based On: Pro…
Boot Up Time 436875697436 50.0 Analysis Based On: Pro…
Display of Sensor and Defeat Capabilities 124123410875 50.0 Analysis Based On: Pro…
Field of View 077683141322 0.0 Analysis Based On: Pro…
Data Contract Display 143847697668 0.0 Analysis Based On: Pro…
Esaily Identifiable Symbology/Graphics 766438907543 50.0 Analysis Based On: Pro…
Total… Effe… RF In… Dete… Bea… Boot… Disp… Fiel… Data… Easi… Cont… Disp… Quan… Audi… Inte… 3D U…
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ECHO
Search
DavidAdministrator 15
Transcriptions
Records▶Interview Series▶Interview-0412.mp4
[00:08:03] David: Today's discussion will be about scheduling a meeting with a client on March 4, 2025.She confirmed availability and coordination details prior to the meeting. ···
[00:08:17] David: Before we begin, can you walk me through the scheduling process? ···
[00:08:29] Katie: Of course. I would be glad to detail how our meeting has been scheduled. ···
Edit text Add tags Change speaker Link to selection Add comment
[ VIDEO FRAME ]
CC480p1.25x⤢
▶ 00:08:16| 00:34:10
Description Recorded interview covering meeting logistics, availability and follow-up coordination. Speakers identified automatically; timestamps linked to the source video for review. …more
Tags
Interview✕Scheduling✕▼
Save Transcript Export
ECHO
Search
DavidAdministrator 15
Transcription RepositoryRepository Overview
Your Storage97% left
500 GB of storage used
File NameModifiedModified BySize•••
Patient Case RecordsJanuary 22, 2020David Thomas45 MB•••
Clinical Trial TestimoniesApril 15, 2021David Thomas5 GB•••
Medical Training SessionsMay 21, 2022David Thomas114 MB•••
University SymposiumAugust 3, 2022Jessica Daniels45 MB•••
Diagnostic InterviewsSeptember 12, 2022James Thomas5 GB•••
Policy Briefings and UpdatesSeptember 17, 2022James Thomas114 MB•••
Scientific BriefingsNovember 1, 2022David Thomas45 MB•••
Peer Review PanelsDecember 15, 2022Jessica Daniels5 GB•••
Research Project DebriefsFebruary 10, 2023David Thomas114 MB•••
Board Review SessionsMarch 2, 2023Jessica Daniels45 MB•••
Quarterly Compliance CallsApril 18, 2023James Thomas5 GB•••
Field Interview ArchiveMay 9, 2023David Thomas114 MB•••
ECHO
Search
DavidAdministrator 15
Welcome David!Glad you’re here. Let’s get you started.
Your Storage97% left
500 GB of storage used
Tutorials & Tips: Uploading a File ✕
Add
Turn your recordings into text by dropping your files here or browsing to upload.
Recent Files
Search
File NameDurationFile TypeSize•••
MP4"The Day I Almost Missed the Train"2:34MP445 MB•••
MOV"How I Found My Lost Dog"2:12MOV5 GB•••
MP4"The Coffee Spill That Changed My Day"2:50MP4114 MB•••
MP4"Heated Exchange on the Metro"3:02MP445 MB•••
MP4"When My Basement Flooded"2:31MP45 GB•••
MOV"The Night the Power Went Out"3:15MOV114 MB•••
MP4"A Surprise at the Airport"2:48MP445 MB•••
MP4"Lost Keys on a Rainy Morning"1:57MP45 GB•••
{{ pdViewLabel }} OF 03 · {{ pdProductName }}
← →

ECHO was built for the government's record problem rather than for the consumer transcription market. FOIA response, hearing and deposition records, IG interviews and multilingual source material all share two constraints that commercial tools do not accommodate: hard timelines, and audio that cannot leave the accreditation boundary under any circumstance.

Inside your boundary

ECHO runs entirely within the customer's environment. Audio never transits a third-party service. For records and oversight workloads this is usually the deciding factor in whether a capability can be used at all, so it is an architectural property rather than a configuration option.

Throughput against intake

The interface reports throughput against intake, so a records office can see whether it is gaining or losing ground rather than only how much it processed. That framing changes staffing conversations from volume to trajectory.

Accuracy, reported honestly

Accuracy is reported per language rather than as a single headline figure, because a blended number hides exactly the material a multilingual team is worried about. Human review remains the release gate; ECHO shortens the path to review rather than replacing it.

Records and release

Packages are tracked from intake to release with the redaction record attached, so the trail behind a released document is assembled as the work happens rather than reconstructed when it is challenged.

CAPABILITIES
Multilingual Transcription FOIA Workflow Hearing & Deposition Records Redaction Record In-Boundary Processing Human Review Gate
TALK ABOUT ECHO

Tell us the decision this would have to support and we will show you the version of it that fits your environment.

DISCUSS ECHO →
HOW TO BUY GSA MAS · SeaPort NxG · COMFRC IDIQ CONTRACTING DETAIL →
HOW THEY FIT TOGETHER

One bench, four points in the same lifecycle.

OPAL works the problem before award, SmarTraq once money is moving, RAM once assets are in service, and ECHO wherever the record itself is the deliverable. They are separately deployable and share the same reconciliation discipline underneath.

BEFORE AWARD

OPAL

Requirements, market research and a buyable package.

MONEY MOVING

SmarTraq

Obligations, burn rate and anomaly forecasting.

IN SERVICE

RAM

Availability, MTTR and predictive maintenance.

THE RECORD

ECHO

Transcription, redaction and release, in boundary.

PRODUCT INQUIRY

Which system are you asking about?

Pick one and tell us what you are trying to solve. Requests go straight to the team that builds the product.

01

RAM

Availability, MTTR and MTBCF computed continuously across a distributed estate.

{{ signRAM }}
02

SmarTraq

Obligations, burn rate and an audit-ready trail, with anomaly forecasting.

{{ signSmarTraq }}
03

OPAL

Requirements, market research and solicitation development, with the context intact.

{{ signOPAL }}
04

ECHO

FOIA response, hearing records, IG interviews and multilingual material.

{{ signECHO }}
{{ kindLabel }}

{{ formHeading }}

{{ formCopy }}

WHAT WOULD YOU LIKE TO DO FIRST?
{{ opt.label }}
PREFERRED FOLLOW-UP
Email Schedule a conversation
START THE CONVERSATION → Sent directly to the product lead. Your information stays private.
{{ kindLabel }}

Conversation started.

Thanks for reaching out. Your request has been routed to the product lead.

ASK ABOUT ANOTHER PRODUCT
LOOKING FOR SOMETHING ELSE? CAPABILITIES → SEE THE WORK → CONTRACTING →

The Boulevard Consulting Group, LLC, DBA BoulevardLabs. SBA 8(a) certified, Native American-owned small business.

FOLLOW
2611 S. Clark St., Suite 430, Arlington, VA 22202 · UEI DYV5P3KPC474 · CAGE 70AG9