BoulevardLabs
NAVAL AVIATION From an Access database to a Certificate-to-Field in under 90 days $1.85M → $4.5M INSTALLATION READINESS 200 installations, one screen 200+ SITES · 24/7/365
GHOST WORKS No Soup Sandwich · ODCS Internship 90-DAY CLOCK · PUBLISHED EXPLORE GHOST WORKS →
PAST PERFORMANCE

Where a customer can't be named, the component and scale are characterized instead.

ALL WORK
CAREERS

Engineering, data science, and Ghost Works.

OPEN ROLES INTERNSHIPS

Hands-on projects and practical challenges, including our Drone Development internship.

EXPLORE INTERNSHIPS →
PROGRAM & PROJECT MANAGEMENT

Most availability problems are queueing problems

Aggregate mean time to repair hides the segment you can actually influence. Decompose it before you fund anything.

JUL 2026 8 MIN READ BOULEVARDLABS INSIGHTS

When availability drops, the reflex is to look at maintenance capacity. Sometimes that is right. More often the constraint is a queue somewhere upstream that produces an identical symptom and responds to an entirely different intervention.

Mean time to repair is an average over a pipeline with several distinct segments: waiting for diagnosis, waiting for parts, waiting for a certified technician, waiting for an approval that batches weekly. Reporting them as one number guarantees effort flows toward the most visible segment rather than the most expensive.

We decompose the pipeline and cost each hold point in availability terms. It is common to find that half the elapsed time sits in two segments nobody has authority over, which reframes the problem from a maintenance investment into a policy conversation.

One installation portfolio we worked found the largest single contributor was a weekly approval cycle. No new capacity, no new parts, no new system. Just a change in batching that recovered days of turnaround.

The analysis is not difficult. What makes it rare is that it requires measuring a process as executed, including the workarounds, rather than as the procedure describes it.

WORK WITH US ON THIS

If this describes a problem your program is carrying, the conversation starts with the question two systems answer differently.

START A CONVERSATION
MORE IN PROGRAM & PROJECT MANAGEMENT JUN 2026 · 6 MIN An analysis nobody can audit is an opinion JUN 2026 · 7 MIN Burn rate is a forward statement, not a historical one MAY 2026 · 5 MIN The baseline you did not document is not a baseline ALL INSIGHTS →

The Boulevard Consulting Group, LLC, DBA BoulevardLabs. SBA 8(a) certified, Native American-owned small business.

FOLLOW
2611 S. Clark St., Suite 430, Arlington, VA 22202 · UEI DYV5P3KPC474 · CAGE 70AG9